
5-10
Installing Rack Components
Connecting Your Master and Protected servers (BSUs)
To connect your master and protected servers, perform the following steps:
1.
As the installation progresses, connect the power cables from individual
system components to the receptacles of the AC distribution panel located in
the rear of the UPS. See Figure 5-8, F.
2.
Designate one server to be your master server and connect the black smart
signaling cable (Figure 5-8, C) received with the PowerChute
®
plus
option,
between a server serial port and the UPS smart signaling port.
3.
On your configuration worksheet, note which server and serial port are
connected as master. The System Administrator will need this information
when loading and configuring PowerChute
®
plus
software.
4.
Using the gray simple signaling cable (Figure 5-8, A) from the interface kit,
connect the server(s) being protected to the basic monitoring ports 1 and 2 of
the interface expander accessory.
5.
On your configuration worksheet, identify each protected server and its
connection to the basic monitoring ports.
6.
Deliver the configuration worksheet to the System Administrator. This
information is required to properly configure PowerChute
®
plus
software.
Summary of Contents for EXPRESS800
Page 1: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 2: ...xxx...
Page 3: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 16: ......
Page 28: ......
Page 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack...
Page 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet...
Page 68: ......
Page 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options...
Page 74: ......
Page 76: ......
Page 77: ...xx...
Page 78: ...456 01544 000...