4-2
Installing the System Rack
Introduction
The steps required to prepare your rack are:
!
Unpack and inventory your rack and its system components.
!
Remove the doors and side panels from the rack to simplify the assembly
of rack components.
!
Position and level the rack(s).
!
Install one or more rack frame link kits when assembling multi-rack
systems.
!
Attach the front stabilizer when your rack is in its permanent location.
What You Need
In addition to the materials shipped to you and standard hand tools, you will
need:
!
a level for leveling the rack and an adjustable wrench to lower and secure
the leveling feet
!
an adjustable wrench or ratchet set to attach the stabilizer to the base of
the rack
!
a #2 and #3 Phillips-head screwdriver to assemble rack-mounting
hardware, and
!
if you are assembling a multi-rack system, you will need a six foot step-
ladder
!
WARNING
It is strongly recommended that two people be present when
assembling the rack and installing system components.
Summary of Contents for EXPRESS800
Page 1: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 2: ...xxx...
Page 3: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 16: ......
Page 28: ......
Page 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack...
Page 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet...
Page 68: ......
Page 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options...
Page 74: ......
Page 76: ......
Page 77: ...xx...
Page 78: ...456 01544 000...