Planning Your Site 2-11
Grounding Requirements
The system rack must have a dedicated ground attached to the power
distribution panel.
The ground wire must have an earth resistance of 100 ohms or less and
depending on your local electrical code, a thickness of 38 mm
2
or more.
A grounding cable (12 gauge) that attaches the rack to frame (earth) ground
must be used.
For safety reasons, ground connections are necessary for both power distribution
systems and air conditioners.
If it happens that the ground to the server and the safety ground must be shared,
branch it near the grounding electrode.
If a building structure such as a steel frame is used as a grounding electrode, use
the main structural member closest to the building foundation.
Summary of Contents for EXPRESS800
Page 1: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 2: ...xxx...
Page 3: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 16: ......
Page 28: ......
Page 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack...
Page 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet...
Page 68: ......
Page 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options...
Page 74: ......
Page 76: ......
Page 77: ...xx...
Page 78: ...456 01544 000...