1. Installing Internal Optional Devices
Express5800/GT110d User’s Guide
55
Chapter 2 Preparations
2.
Install the connector board and battery control cable supplied with the N8103-121 extra battery onto
the RAID Controller.
Tips
For the installation procedure, refer to the user’s guide supplied with the extra
battery.
3. Refer
to
Chapter 2 (1.3 Overview of Installation and Removal)
for preparations.
4.
Remove the side cover while referring to
Chapter 2 (1.4 Removing the Side Cover)
.
5. Remove the battery fixing plate attached to the
bottom of the HDD cage.
6.
Remove the bracket that comes attached to the battery pack by removing the three screws and attach
the plate you removed in step 4.
Remove one screw
Slide toward the rear of the server