9-54 Upgrading Your Server
14.
Install the front cooling fan and secure it with a screw, as before.
Be sure to route the front cooling fan cable in the same way as before.
15.
Connect the front cooling fan cable to the connector for front cooling fan located on
mother board.
16.
Install the left side cover you have removed in earlier step.
Removal
The internal USB floppy disk drive can be removed in the reverse order of the installation. If the
device is removed but not installed again, install the dummy panel in the vacant bay.
Summary of Contents for Express5800/120Ei
Page 16: ...x This page is intentionally left blank ...
Page 161: ...Configuring Your Server 4 93 3 Setting menu for VD 0 is displayed ...
Page 238: ...7 12 Maintenance This page is intentionally left blank ...
Page 356: ...C 2 IRQ This page is intentionally left blank ...
Page 410: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 414: ...G 4 Product Configuration Record Table This page is intentionally left blank ...