![NEC Express5800/120Ei User Manual Download Page 287](http://html.mh-extra.com/html/nec/express5800-120ei/express5800-120ei_user-manual_251183287.webp)
Upgrading Your Server 9-7
Installation
The side cover can be installed in the reverse procedure of the removal. Make sure that the hooks on
the side cover are inserted into the frame holes of the server certainly. When you install the cover by
sliding the cover toward the front of the server, also make sure that the hooks on the front side are
engaged with the frame of the server. Otherwise, you will fail to install the cover securely.
Finally, install the left side cover and secure it with two screws removed in step 5 of removal
procedure.
Hooks
Frame holes
Rear of the left side cover
Frame of the server
Lock plate
Screws
Frame holes
Insert a lock plate here.
Hooks
Summary of Contents for Express5800/120Ei
Page 16: ...x This page is intentionally left blank ...
Page 161: ...Configuring Your Server 4 93 3 Setting menu for VD 0 is displayed ...
Page 238: ...7 12 Maintenance This page is intentionally left blank ...
Page 356: ...C 2 IRQ This page is intentionally left blank ...
Page 410: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 414: ...G 4 Product Configuration Record Table This page is intentionally left blank ...