This chapter contains information to help the technician install the KSUs for the
Electra Elite IPK II system. The technician should be familiar with this section before
installing any equipment.
S
ECTION
2
S
ITE
P
REPARATION
AND
MDF/IDF C
ONSTRUCTION
Preinstallation planning is essential. Advanced planning minimizes installation time,
cost, and disruption of the customer business activities.
2.1
Precautionary Information
1.
Never install telephone wiring during a lightning storm.
2.
Never install telephone jacks in wet locations unless the jack is
specifically designed for wet locations.
3.
Never touch uninsulated telephone wires or terminals unless the
telephone line is disconnected at the network interface.
4.
Use caution when installing or modifying telephone lines.
2.2
Surveying the Customer Site
In most cases, a survey of the customer site is necessary to determine the
proper placement of the Main Distribution Frame (MDF), the exact dimensions
of the area selected for the MDF, cabling requirements, and possible
Intermediate Distribution Frame (IDF) locations.
Observe the following warnings during installation.
Summary of Contents for ELECTRA ELITE IPK II
Page 2: ......
Page 3: ...SYSTEM HARDWARE MANUAL INT 1076 IPK II DOCUMENT REVISION 3 VERSION 2000...
Page 4: ......
Page 6: ......
Page 10: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 641: ...SYSTEM HARDWARE MANUAL NECUnified Solutions Inc Document Revision 3...
Page 642: ......