Using This Guide xi
!
WARNING
Some locations within the server have high voltage and therefore are very
dangerous. To avoid risk of electric shock, turn off all server power and
disconnect power cables before working inside the server unit.
The main power of your server is turned off by turning off the power source to the
server or removing the power cable.
Before touching the parts in the server, wait for at least 10 to 15 seconds until
residual voltage is discharged.
Safety Notices for Users Outside of the U.S.A. and Canada
!
PELV (Protected Extra-Low Voltage) Integrity:
To ensure the extra-low voltage
integrity of the equipment, connect only equipment with mains-protected electrically-
compatible circuits to the external ports.
!
Remote Earths:
To prevent electrical shock, connect all local (individual office)
computers and computer support equipment to the same electrical circuit of the building
wiring. If you are unsure, check the building wiring to avoid remote earth conditions.
!
Earth Bonding:
For safe operation, only connect the equipment to a building supply
that is in accordance with current wiring regulations in your country. In the USA those
wiring standards are regulated by Underwriter Laboratories (UL); in the U.K., by the
Institution of Electrical Engineers, (IEE) and in Canada by the Canadian Standards
Association (CSA).
Summary of Contents for 1080Xd
Page 1: ... U s e r s G u i d e EXPRESS5800 1080Xd ...
Page 2: ......
Page 4: ......
Page 15: ...1 System Overview Overview System Features System Chassis System Functions Expansion Security ...
Page 51: ...3 Service Processor SP Console OS Console Virtual SOP SP Command Console SP Command Reference ...
Page 172: ......
Page 189: ...6 Problem Solving Solving Simple Problems Troubleshooting the System ...
Page 193: ...A Technical Specifications Main Chassis DVD ROM Drive Tape Drive FDD ...
Page 198: ......
Page 199: ...B Memory Upgrades Memory Configurations DIMM Installation ...
Page 210: ......
Page 215: ...xx ...
Page 216: ... 456 01683 001 ...