![background image](http://html.mh-extra.com/html/nec/1080xd/1080xd_user-manual_251085033.webp)
System Operation 2-5
A
AC Power Circuit Breaker
Figure 2-4. PCIX Unit AC Power Circuit Breaker
5.
On the front of the server cabinet, power on the AC POWER switch at the
top of the system (see Figure 2-5).
A
AC Power Switch
Figure 2-5. AC Power Switch
Note:
If the AC-Link function has been enabled, following the AC
power being turned on, and if the operating system has been installed,
the system will automatically boot up the operating system without
further intervention (refer to the description of the SU command in the
Express5800/1080X Service Guide).
If the AC-Link function has not been enabled, then continue with this
“Starting Up the System” procedure.
A
A
Summary of Contents for 1080Xd
Page 1: ... U s e r s G u i d e EXPRESS5800 1080Xd ...
Page 2: ......
Page 4: ......
Page 15: ...1 System Overview Overview System Features System Chassis System Functions Expansion Security ...
Page 51: ...3 Service Processor SP Console OS Console Virtual SOP SP Command Console SP Command Reference ...
Page 172: ......
Page 189: ...6 Problem Solving Solving Simple Problems Troubleshooting the System ...
Page 193: ...A Technical Specifications Main Chassis DVD ROM Drive Tape Drive FDD ...
Page 198: ......
Page 199: ...B Memory Upgrades Memory Configurations DIMM Installation ...
Page 210: ......
Page 215: ...xx ...
Page 216: ... 456 01683 001 ...