2-8
Hardware Installation
2. Route
the
cables
through
the
Cable
Strain
Relief
and
over
the
Cable
Guide
as
shown
below.
3. Replace
the
Stand
Cable
Cover.
Customer Display Configuration
If
configured
with
a
Customer
Display
the
cables
are
routed
from
the
bottom
of
the
Stand
up
through
the
Customer
Display
Pole.
29188
Cable Strain Relief
Cable Guide
29184
Summary of Contents for RealPOS 50
Page 1: ...NCR RealPOS 50 7611 Release 1 1 User Guide B005 0000 2017 Issue C...
Page 10: ...x...
Page 48: ...1 38 Product Overview...
Page 58: ...2 10 Hardware Installation USB Keyboard w Glide Pad 29246...
Page 88: ...2 40 Hardware Installation...
Page 122: ...6 6 BIOS Updating Procedure...
Page 136: ...7 14 Solid State Drive Optimization...
Page 143: ...2x20 Customer Display Interface 9 5 CP437...
Page 144: ...9 6 2x20 Customer Display Interface CP858...
Page 145: ...2x20 Customer Display Interface 9 7 CP866...
Page 146: ...9 8 2x20 Customer Display Interface CP932...
Page 147: ...2x20 Customer Display Interface 9 9...
Page 148: ...9 10 2x20 Customer Display Interface...
Page 154: ...10 6 Touch Screen Operation...
Page 156: ...A 2 Windows 7...