background image

NANAWALL HSW75 OWNER’S MANUAL

11 

of the axle of the floor closer with the center of the top 
axle. 

See Sheet 12 of the Installation Manual.

In preparation for the installation of panel #5, take off the 
end cap and top cover on the inside. Screw the adjustable 
bracket onto the threaded bolt of the top axle and make 
sure that the set screw at the side is lose. Now you can 
install panel #5 by lifting the receiver shoe that is installed 
underneath the bottom of the panel, on top of the axle of 
the floor closer. Line the top axle with bracket up with the 
shoe that is inserted into the top profile and connect both 
parts with one another. 

See Sheet 13 of the Installation 

Manual.

Before you finally tighten down all screws, make sure that 
all dimensions are set correct, the panel can be opened 
and closed with the right clearance and check if the 
panel is plumb and level. Then fix all screws in place and 
secure the top axle by fixing the set screw from the side. 
Afterwards put the top cover with end cap back on. 

After everything is installed and adjusted including the 
floor socket for the locking point of the pivot panel, use 
suitable material to fix the floor closer in place.

Step E5

 

For the offset pivot end panel (non-sliding) with floor

 

closer, the dimension for the center of the pivot axle of

 

the floor closer to the chalk line (CL of track) should be 2

 

1/16

"

 (52 mm). The center point is then offset to the wall 

by 1/16

"

 (2 mm). Please check custom product drawing for 

swing direction (inside/outside). 

See Sheet 14 and 15 of

 

the Installation Manual.

 Mark this dimension on the floor. 

Then mark the dimensions of the box on the floor, too 
and if concrete, cut and chisel out the concrete to recess 
the floor closer into the floor. Position the box at the right 
location in relationship to the edge of the wall. Make sure 
that the full underside of the box rests on a flush and level 
surface and fix it temporarily into place. Then install the 
receiver box for the top axle by hanging it off on the side 

of the top track and fix it slightly with the 2 set screws. 
Use a transit/laser or other similar precise measuring 
equipment to line up the center of the bottom axle of the 
floor closer with the center of the top receiver box.

The 2 offset pivot brackets are installed on panel #5 
already. When you start installing this panel, set the 
bottom pivot axle on top of the pivot axle of the floor 
closer and line up the top bracket with the receiver box 
at the top. Take the top axle out of the accessory box and 
connect the bracket and the receiver box by sliding it in 
from underneath. Fix the top axle with the set screw from 
the side and add the cover with screw. Before you finally 
tighten down all screws, make sure that all dimensions are 
set correct, the panel can be opened and closed with the 
right clearance and check if the panel is plumb and level.

After everything is installed and adjusted including the 
floor socket for the locking point of the pivot panel, use 
suitable material to finally fix the floor closer in place. 
Before you put on the cover for the floor closer, make sure 
to measure how much to cut off to make it fit with the 
edge of the wall.

F. FINAL STEPS

Step F1 

Close and lock all panels into position. For proper 
operation, follow the instructions in the Operation section 
of this manual. Check that the system operates and 
functions properly

Step F2

 

For single/double action sliding panels, install the 
locking receiver on the side of the head track where the 
Conversion Box with bolt is located. 

See Sheet 10 of 

Installation Manual and CAUTION in section B above. 

Make sure the locking receiver is aligned to the locking 
bolt of the Conversion Box and tighten it with 2 sets 
crews to the top track. The first step to convert a single/

Summary of Contents for HSW75

Page 1: ...ingle Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWall...

Page 2: ...s of glass The NanaWall glass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass p...

Page 3: ...E OF A 5 PANEL UNIT Panel 1 sliding panel Panel 2 sliding panel Panel 3 sliding panel Panel 4 sliding panel Panel 5 double action end panel non sliding with pivot box or double action end panel non sl...

Page 4: ...lean and dry location and protect against defacement or damage especially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider than...

Page 5: ...lable please verify the type of sockets for this order If planning to cut into a post tensioned concrete for bottom door closers pivot boxes and sockets a structural engineer and architect has to be c...

Page 6: ...ews provided See Sheet 4 of the Installation Manual Make sure that the correct angles between segments are maintained and that the transitions between the track segments are perfectly aligned and smoo...

Page 7: ...FORCED TO ENSURE THAT THE UPPER TRACK IS NOT BOWED Upper track segments must be joined such that they are even tight and aligned perfectly Otherwise the running carriages may wear out prematurely whic...

Page 8: ...E HAS TO BE SECURED TO THE SOCKET IN THE PIVOT BOX IN THE FLOOR BEFORE THE SINGLE DOUBLE ACTION SLIDING PANEL CAN FUNCTION PROPERLY OTHERWISE IT WILL NOT BE STABLE AND CAN FALL AND HURT SOMEBODY C GAP...

Page 9: ...hanism is not in the way Make sure the panels are straight and the correct 4 mm gap between panels is maintained Start with the panel furthest away from the parking bay and add blue masking tape under...

Page 10: ...6 52 mm Please check custom product drawing for swing direction inside outside See Sheet 14 and 15 of the Installation Manual Mark this point and if concrete use a diamond core drill bit with 1 1 4 di...

Page 11: ...ip to the edge of the wall Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the receiver box for the top axle by hanging i...

Page 12: ...ed Check if all angles are correct Each leg of the stacking bay track should be equidistant at all points Step F5 Correct any problems before you finish the trimming Do not attach any trimming directl...

Page 13: ...n edge bolt with hand or foot d Automatic Locking when adjacent panels are pulled together and properly aligned the bolt automatically engages 4 Note that there is a carrier at each upper corner of a...

Page 14: ...e head track and engages to the top rail Turn about 8 10 revolutions in a clockwise direction until there is a slight resistance 3 Release the Quick Release Lock on the pivot side to disengage the loc...

Page 15: ...ce Its appearance may be marred by harsh chemicals abuse or neglect Frequency of cleaning depends on exposure and needs For aluminum surfaces generally warm soapy water should be sufficient Stubborn s...

Page 16: ...licable codes and regulations Glass shall meet the current requirements of ASTM C 1306 Standard Specifications for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shal...

Page 17: ...soap and fresh water at least every month and more frequently if necessary After washing the surface should be rinsed thoroughly with clean water and allowed to dry For cleaning do not use abrasive h...

Page 18: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Page 19: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Page 20: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Page 21: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Page 22: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Reviews: