Page 9
WARNING
This machine is designed for indoor use only.
The game must not be installed outdoors or under the following conditions:-
a.
In areas directly exposed to sunlight, high humidity, direct water contact,
dust, high heat or extreme cold.
b.
In locations that would present an obstacle in the case of an emergency,
i.e. near fire equipment or emergency exits.
c.
On an unstable or uneven surface, or subject to floor vibration.
4-1 Fitting the Header Assembly
The Header Assembly has a forward centre of gravity, so it is important
that at least two people are used to fit or remove the Header
Assembly.
The fitting position of the Header Assembly is very high, and it is important
that a means of reaching the height safely, without stretching, is available.
(e.g. steps, step stools etc.)
1.
Place the Header Assembly on to the monitor cabinet, connect the
connectors and pass the connectors in to the cabinet, locate the blocks on
the base of the Header Assembly into the cutouts on top of the Monitor
Cabinet.
2.
Fit the 2off M8x50 Hex Head Screws, Spring and Flat Washers to retain
the Header Assembly to the Monitor Cabinet.
Summary of Contents for Prop cycle
Page 7: ...Page 7 3 MAJOR COMPONENTS...
Page 44: ...Page 44...
Page 46: ...Page 46...
Page 50: ...Page 50...
Page 55: ...Page 55...
Page 56: ...Page 56 9 SCHEMATICS...
Page 57: ...Page 57...
Page 58: ...Page 58...
Page 59: ...Page 59...