8
5. IMPORTANT INSTALLATION INFORMATION
n
Shower installation must be carried out by a
suitably qualified person and be in accordance with
BS 7671 (IEE wiring regulations) building regulations,
water regulations and or any specific local water
company regulations in force and should be in
accordance with BS EN 806.
n
This shower unit is designed to be connected to a
15mm cold water mains supply.
n
To make sure the heating elements are activated
the shower must be connected to mains water supply
with a minimum running pressure of 100kPa (15lb/
sq in) – 1 Bar at a minimum flow rate of 8 litres per
minute. The maximum static pressure is 1000kPa
(150lb/sq in) 10 Bar.
NOTE: For 9.5kW units the minimum running
pressure must be obtained at 9 L/min.
For 10.5kW units the minimum running
pressure must be obtained at 11 L/min.
n
The shower unit must not be fitted where it may
be exposed to frost, for example in an outdoor area.
The shower must not be used if suspected of being
frozen. Frost damage is not covered by the guarantee.
n
Plumbers jointing compound must not be used.
In instances of difficult joints use P.T.F.E. Tape.
The use of jointing compound will invalidate the
product guarantee.
n
dO NOT solder fittings near the shower unit
as heat can travel along pipe work and damage
components.
n
dO complete all plumbing connections before
making the electrical connections.
6. FIXING THE SHOWER TO THE WALL
Position your shower on the wall so that it will NOT
be in the direct water spray from the shower handset
when fixed.
You may wish to consider mounting the unit so that
the shower handset could be used over a sink for
washing hair.
The shower unit should be positioned so that the
shower head cannot be immersed in the bath or
shower tray when hanging down. A shower hose
retainer is supplied with the accessories (see pages
3 and 9).
The unit can be mounted at a lower level if required
for less abled users and for use with a shower seat.
Remove the four front cover fixing screws and lift
the cover off complete with the warmer (+) and
cooler (-) push buttons and flow control knob in
place. Note the connector and lead attached to the
control PCB mounted on the shower back plate.
This will require connecting to inside of the front
cover before completing the installation.
Having decided on the water and cable entry points
and chosen a flat piece of wall hold the shower
vertically against the wall and mark the top two
fixing holes.
Carefully drill the two holes as marked using a sharp
5.5mm masonry drill after first making certain there
are no pipes or wires behind the proposed holes.
Insert the wall plugs and screws provided leaving the
screw head proud by approximately 5mm. The shower
can now be hung on these screws.
Make sure that the shower is positioned vertically now
mark and drill the lower slotted fixing hole. Then fix
the shower to the wall. Do not fully tighten the screws
at this stage.
The shower back plate has moulded knock out
sections which are clearly indicated to allow the
chosen service entry option to be removed prior to
final fix.
Summary of Contents for Thermo Response QI
Page 27: ...27 Notes...