DAILY START UP FOR PATRIOT SYSTEMS
External Mix System
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE TICKED OFF AS
COMPLETED. USE THIS CHECKLIST IN CONJUNCTION WITH THE OPERATING MANUAL FOR THE
PATRIOT U
NIT. THIS SEQUENCE FOLLOWS ON FROM “FIRST TIME START-UP CHECKLIST –
EXTERNAL MIX”
ACTIVITY
NO.
ACTIVITY
TICK WHEN
COMPLETED
Priority
Put on Respirator as specified for spray painting, Protective Clothing,
Eye Protection, and PVC Gloves
1
Check all hoses for damage.
2
Check all material supplies and fill or replace as needed.
3
Open recirculation valve on Catalyst Manifold
4
Open main inlet air valve on the manifold.
5
Remove the Pivot Pin from the catalyst drive.
6
Manually pump the catalyst pump with the catalyst drive, observe catalyst
returning to the catalyst jug, pump until the stream is air free.
7
Close recirculation valve on Catalyst Manifold.
8
Manually pump the catalyst pump with the Slave Arm drive, bring catalyst
pressure to operating pressure 100psi.
9
Check resin pump pressure, if needed slowly turn up the pump air pressure
to the operating pressure, 30
– 50 psi. If a safety over ride valve is installed
press and hold the priming button while adjusting air pressure
10
Replace the Pivot Pin into the catalyst pump drive.
11
Check atomizing air pressure, adjust as necessary.
12
Lubricate the nozzle o-rings, stud o-rings and gun front threads
13
Install nozzle and catalyst tip onto the gun.
THE UNIT IS NOW READY FOR USE
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
when
corrected
OPERATORS NAME ________________________________________DATE: ___________________
SIGN OFF WHEN START UP CHECKS ARE COMPLETED: __________________________________