Roll systems – Maintenance Manual
19
AP-74100, Rev. 2.0, 12/01/05
3.2.2. Replace the operation panel PCB box
Step 1 :
Remove the operation panel.
Step 2 :
Loosen the sensor cables.
Step 3 :
Remove the parallel connector cable.
Step 4 :
Loosen the two screws fixing the parallel connector.
Step 5 :
Loosen the four screws fixing the operation panel PCB box.
Step 6 :
Remove the operation panel PCB box.
Summary of Contents for Unwinder
Page 2: ...Roll systems Maintenance Manual 2 AP 74100 Rev 2 0 12 01 05 ...
Page 4: ...Roll systems Maintenance Manual 4 AP 74100 Rev 2 0 12 01 05 ...
Page 6: ...Roll systems Maintenance Manual 6 AP 74100 Rev 2 0 12 01 05 ...
Page 100: ...Roll Systems Maintenance Manual 100 AP 74100 Rev 2 0 11 01 05 Scroller support R ...
Page 101: ...Roll Systems Maintenance Manual 101 AP 74100 Rev 2 0 11 01 05 ...