952.5-0000010 OM
120
To reinstall the floating drawbar from additional position to operation position do the
following:
- remove pins 7 (figure 4.4.13) from crossbar 8;
- lower the RLL so, that the levers 13 take the horizontal position;
- open the grippers 12 with a help of handle 14;
- remove pin 6 and take off hydraulic hook 9;
- pull out pin 2 from floating drawbar 4 overlay, releasing thereby clevis 1 with pin 3,
then mount back the pin 2;
- install the clevis 1 on floating drawbar 4 and fix on it with a help of pin 3;
- install floating drawbar assembly in operating position as shown in figure 4.4.12
and secure with pin 6 (figure 4.4.13);
- lift RLL in upper position;
- set pins 7 in holes of crossbar 8;
- move bolt 11 in threaded hole of bracket 10 lug to the left of gripper 12;
- put pins 15 into holes of bracket 10 securing thereby the floating drawbar from
side-to-side movement;
- set hydraulic hook in additional position, as shown in figure 4.4.12.
To reinstall the hydraulic hook from additional position into operating position do the
following:
- move bolt 11 (figure 4.4.13) in threaded hole of bracket 10 lug to the right of
gripper 12;
- remove pins 7 from crossbar 8, remove pins 15 from bracket 10;
- lower RLL so, that the levers 13 take the horizontal position;
- open grippers 12 with a help of handle 14;
- pull out pin 6 and remove floating drawbar assembly;
- take off hydraulic hook from plate 5 and bracket 10;
- set hydraulic hook in operating position, as shown in figure 4.4.12, and secure
with pin 6 (figure 4.4.13);
- set pins 7 in holes of crossbar 8, securing thereby hydraulic hook 9 to the cross-
bar;
- lift RLL in upper position
- set floating drawbar in additional position, as shown in figure 4.4.12.