3.6 Tasks after extended out-of-service periods (>3 weeks)
Tasks after extended out-of-service periods (>3 weeks)
Note:
Operate fuel treatment system for at least 5 minutes.
1.
Start up fuel treatment system (→ Page 83).
2.
Shut down fuel treatment system (→ Page 87).
MS150069/02E 2014-03
| Operation | 81
TIM-ID: 0000007730 - 005