1
WA R N I N G
!
WA R N I N G
!
When connecting to ground, please read all
safety hazard warnings.
The air must be free of water and oil.
1. Feed air
2. Dosage air
3. Powder hose
Implementing
For commissioning the Topcoater it needs a 230V outlet, a
good conductive ground connection and an air connection
with 6 bars.
1. Check all powder hose and electrical cable connections.
2. Connect the ground wire to true earth ground.
3. Plug the connecting cable.
4. Connect air supply to Topcase and injector.
5. Place the powder container on the cart. Lower the
suction tube into the powder.
6. After reading the manual, switch on the Topcase
controller.
3
2
PA-18-02-R0 (08/2018)
14 / 52
www.carlisleft.com
INTRODUCTION
EN