
5 Mounting
Maschinenfabrik Reinhausen GmbH 2015
48
4427410/00 EN
OILTAP® R
Connecting on-load tap-changer take-off lead
There are through-holes 13 mm in diameter at several points in the take-off
ring of the oil compartment for connecting the on-load tap-changer take-off
lead.
Proceed as follows to connect the on-load tap-changer take-off lead:
1.
Connect the on-load tap-changer take-off lead to any through-hole on
the take-off ring of the oil compartment.
2.
Secure screw connection.
Figure 34: Take-off ring on oil compartment
Carrying out the transformer ratio test
We recommend carrying out a transformer ratio test before the transformer
is dried. The following types of transformer ratio test are possible:
▪
Transformer ratio test with TAPMOTION® TD test drive
▪
Manual transformer ratio test
5.2.2.6
5.2.3
Summary of Contents for OILTAP R
Page 1: ...On Load Tap Changer OILTAP R Installation and Commissioning Instructions 4427410 00 EN ...
Page 204: ......
Page 205: ......