21
7.5.
High Pressure Installation
The V-2 Series has a few installation options to choose from. Seeing the wide array of
machine types and variations of each type, MP Systems has an installation kit and installation guide
suited for every cu
stomer’s needs. This section will cover the basic 4 ports and remote manifold
installation on machine tool. Please refer to machine specific install manuals for proper hose routing
inside machining cabinet.
7.5.1.
Generic 4 Port Installation
Depending on the options installed on machine to
ol, holes may need to be drilled and ¼” JIC
Bulkheads will need to be installed
.
▪
Locate suitable location for 4, ½” holes to be drilled. (Use caution to make sure there is
clearance for hoses to be routed on the inside of the machine tool cabinet.)
▪
Install 4,
¼” JIC Bulkheads included in installation kit.
▪
Run 4 high pressure hoses from installation kit from JIC Bulkhead to corresponding ports on
V-2 Series high pressure coolant system.
Inside lines will vary machine to machine and application to application.
Summary of Contents for V Series
Page 6: ......
Page 17: ...11 5 Floor Layout ...
Page 29: ...23 ...
Page 39: ...33 11 1 Relief Valve Identifier ...
Page 44: ......
Page 45: ...1 ...
Page 46: ......