
16
7.3.3.
Control Signal Cable Installation
1. Mount supplied control signal harness with hardware provided in V-2 Series Kit and route
cable.
▪
Make sure the V-2 Series plug is able to reach mounted harness.
▪
If ½” conduit plug is not available, knock out hole and use cord grip supplied in kit.
▪
Use zip tie to attach supplied dummy plug to control signal (19 Pin Only).
*IF THE V-2 SERIES HIGH PRESSURE COOLANT PUMP NEEDS TO BE UNPLUGGED FROM MACHINE, REPLACE V-2 SERIES CONTROL
SIGNAL CONNECTION WITH SUPPLIED DUMMY PLUG (19 Pin Only).
2. Wire signals needed to perform desired pump function.
▪
All MP signals are 24vdc. Relays may need to be installed for 110VAC signals.
▪
Signals and M codes may vary between machines. Confirm with machine tool electrical
drawing before wiring.
▪
Some external M codes may require latching functions.
▪
MP Alarm contains both NC and NO connections through 1 common.
▪
NC alarms are typically wired in series with machine low pressure pump.
▪
NO alarms are typically wired in parallel with machine low pressure pump.
▪
Refer to V-2 Series signal schematic located in rear of this manual, please verify proper
schematic.
Please call MP Systems with any questions or concerns before wiring at 877-689-1860.
Summary of Contents for V Series
Page 6: ......
Page 17: ...11 5 Floor Layout ...
Page 29: ...23 ...
Page 39: ...33 11 1 Relief Valve Identifier ...
Page 44: ......
Page 45: ...1 ...
Page 46: ......