
29
9.1.
Filter Bag Replacement
To change a Filter Bag:
1. Power off V-2 Series High pressure system.
2. Let pressure equalize for 30 seconds.
3. Loosen 3 galvanized eye bolts on filter cover Lift away filter top.
4. Slowly lift filter bag by handles on bag seal (coolant should drop as bag is lifted)
5. Install new bag.
6. Replace filter top and secure 3 galvanized eye bolts.
Summary of Contents for V Series
Page 6: ......
Page 17: ...11 5 Floor Layout ...
Page 29: ...23 ...
Page 39: ...33 11 1 Relief Valve Identifier ...
Page 44: ......
Page 45: ...1 ...
Page 46: ......