model no. 140-0050-6 | contact us 1-888-942-6686
26
m
aintenance
Feed your new synthetic cable/rope through
the hole in the drum and knot accordingly.
The cable/rope may not be knotted as the
end is wrapped. If the new cable/rope isn’t
wrapped, knot accordingly.
When re-spooling the cable/rope, ensure
that it spools in the under-wind position with
the cable/rope entering the drum from the
bottom, not the top.
Replace set screw and tighten to
3.7–4.4 lbf-ft (5–6 Nm).
5
6
7
8
Move the clutch to the “In” position.
To re-spool correctly, and while wearing
gloves, keep a slight load on the cable/rope
while pushing the mini-rocker switch button
“In” to draw in the cable/rope.
in
in