
EN
27
7. Mandatory Maintenance and Check-up Operations
▪
Replace group gaskets
▪
Replace diffuser screens
▪
Check brew temperature
▪
Check brew pressure
▪
Check/note water hardness
(Water quality must be within the
range of parameters specified
in the chapter on Installation,
otherwise warranty is voided)
▪
Inspect solenoid valve (s)
▪
Inspect plumbing for leaks
or clogs
▪
Check all switches for proper
operation
▪
Check filter baskets
These operations are in addition to the Maintenance and Periodic Cleaning Operations as specified in Chapter 6.
The following maintenance and check-up operations sould be carried out by a qualified technician.
The time required for the periodic maintenance is determinated by the quantity of daily work and/or coffee consumption.
N.B. These periodic maintenance operations are not covered by warranty.
▪
Check the condition of the inside of boilers and if necessary rinse out with a proper cleaning product allowed for food and beverage
appliances.
EVERY THREE/FOUR MONTHS
EVERY YEAR (in addition to the above)
EVERY 3 YEARS (in addition to the above)
▪
Replace portafilter baskets
▪
Inspect electrical wiring
condition
▪
Inspect boilers safety switches
▪
Inspect electrical wiring
condition
▪
Remove and clean/inspect
boiler temperature probes
▪
Accurate control of the
tightness at 2,4Nm of each
cable on the terminal block.
Summary of Contents for AV 1
Page 29: ...EN 29...
Page 110: ......