
run (by means of
X/W
button pressing), the
actual P6 setting can be viewed. after the last
cycle or programme without cycling are ended,
the parameters are not shifted, i.e. the last
parameters according to which the programme
ran can always be seen after the programme
ending or interruption (with or without cycles).
4.7.6
MANUAL
SHIFTING
OF
P
6
PROGRAMME
bEGINNING
–
USER
SERVICE
64
Duration of all segments remains unchanged.
S e
r v
ι
c e
6 4
S h i f
t
p r
o g r
.
P 6
after starting (
STArT/STOp
– see ), zero
segment time and date is displayed.
S e
r v
ι
c e
6 4
0 9 : 0 0
2 0 0 9 -
0 2 - 1 8
or
S e
r v
ι
c e
6 4
0 9 : 0 0
2 0 0 9 -
1 8 - 0 2
or
S e
r v
ι
c e
6 4
0 9 : 0 0
0 2
- 1 8
- 2 0 0 9
or
S e
r v
ι
c e
6 4
0 9 : 0 0
1 8
- 0 2
- 2 0 0 9
any parameter can be changed (year can be
changed by one year forward or backward only
as compared to the actual year). By pressing
X/W
, the programme is shifted by a difference
between the new and old segment time
(“Performed” is displayed).
S e
r v
ι
c e
6 4
x
P e r f
o r
m
e d
The programme can be shifted both forward
and backward. Time (hh:mm) is always at the
beginning of the line. Date is displayed in a
format selected in the user service 3 (i.e. 4
possibilities of the sequence year-month-day).
This differs from segment 0 setting, where year is
always in the first place.
4.7.7
ExAMPLES
OF
P
6
PROGRAMME
SETTING
Example 1: Day and night phase with different
temperatures
required : 9.00 am – 5.00 pm – temperature
220 °C,
6.00 pm – 8.00 am on the next day – temperature
150°C, indefinite number of cycles
P 6
0 0
>
-
-
.
-
- 0 8 : 0 0
1 0 0
2 0 0 9
0 2 . 1 8
P 6
0 1
>
2 2 0
0 9 : 0 0
1 0 0
0 2 . 1 8
P 6
0 2
>
2 2 0
1 7 : 0 0
1 0 0
0 2 . 1 8
P 6
0 3
>
1 5 0
1 8 : 0 0
1 0 0
0 2 - 1 8
P 6
0 4
>|
1 5 0
c
0
o
8
o
: 0 0
1 0 0
0 2 . 1 9
Program start: 18 February, 2009 at 8.00 am. The
setting showing “c oo” (cycling activation) must
be on the display at the programme start.
- The programme can be started at any time
between 8:00 am on 18 February, 2009 and
8:00 am on 19 February, 2009 without any
programme definition adjustment.
- If the programme is to be started after 8:00
am on 19 February, 2009, date only is shifted
in Service 64 (duration of the programme is
24 hours so that all times remain unchanged);
the actual time should be taken into account.
If the programme is switched on earlier than at
8:00 am, the programme start should be set to
yesterday’s date; otherwise, waiting segment
(delayed start) begins and the device begins
to temper at 8:00 am only. When starting after
8:00 am, the date in Service 64 is simply set to
the actual date.
- if a power supply failure occurs, the
programme will always start in the moment
where it would have been if the run had not
been interrupted. i.e. the date and night phase
with breaks at 9:00 am and 6:00 pm will be
ensured.
Example 2: Week cycle
requirement: 5 working days in a week –
operation at 120 °C,
2 weekend days at temperature 80 °C; this
operation should be repeated 99 times cyclically.
Instructions for use
20
LSI_K_np_en 1206_mmm_V2.08_B2V