4 - 2
MELSEC-A
4 SETUP AND PREPARATION BEFORE OPERAATION
CAUTION
Dispose of the product as industrial waste.
Use the module in the environment indicated in the general specifications given in
this manual.
Not doing so can cause an electric shock, fire, malfunction, product damage or
deterioration.
Securely fix the module to a DIN rail or with mounting screws, and securely tighten
the mounting screws within the specified torque range.
Undertightening can cause a drop or malfunction.
Overtightening can cause a drop or malfunction due to damage of the screws or
module.
Be sure to shut off all phases of the external power supply used by the system
before mounting or dismounting the module to or from the panel.
Not doing so can cause the module to fail or malfunction.
Before handling the module, always touch grounded metal, etc. to discharge static
electricity from the human body.
Failure to do so may cause the module to fail or malfunction.
(1) Tighten the screws such as module installation screws and terminal screws with
the following torque:
Screw location
Tightening torque range
Module installation screw (M4 screw)
78 to 108N cm
Terminal block terminal screw (M3 screw)
59 to 88N cm
Terminal block installation screw (M3.5 screw)
68 to 98N cm
(2) A protective film is attached on the module’s surface for the purpose of scratch
prevention during transportation.
Prior to use, be sure to remove it.
(3) When using the DIN rail adapter, install the DIN rail by making sure of the
following:
(a) Applicable DIN rail models (conforming to the IEC 60715)
TH35-7.5Fe
TH35-7.5Al
(b) DIN rail installation screw interval
When installing the DIN rail, tighten the screws with less than 200mm (7.87
inch) pitches.
(4) When mounting the AJ65SBT-62DA to the DIN rail, press with your finger the
centerline of the DIN rail hook at the bottom of the module until it clicks.
DIN rail
DIN rail hook
(5) Refer to the Master Module user's manual for the name, specification, and
manufacturers of supported cables for the use with AJ65SBT-62DA.
Summary of Contents for AJ65SBT-62DA
Page 2: ......
Page 12: ...A 10 MEMO...
Page 14: ...1 2 MELSEC A 1 OVERVIEW MEMO...
Page 42: ...4 10 MELSEC A 4 SETUP AND PREPARATION BEFORE OPERAATION MEMO...
Page 48: ...5 6 MELSEC A 5 PROGRAMMING 3 Program example...
Page 62: ...6 6 MELSEC A 6 TROUBLESHOOTING MEMO...
Page 69: ...Index 3 MEMO...
Page 71: ......