![Mitsubishi Heavy Industries SRK60ZJX-S Technical Manual Download Page 28](http://html.mh-extra.com/html/mitsubishi-heavy-industries/srk60zjx-s/srk60zjx-s_technical-manual_1811938028.webp)
-
-
'10 • SR-T-091
Model SRC50ZJ-S
R
C
T
0
0
0
Z
0
0
5
L2
Intake
Outlet
Intake
L3
L1
Minimum installation space
Service
space
( )
L4
L2
L3
L4
L1
100
100
250
Open
I
I
I
Open
250
80
280
I
II
280
Open
80
75
Examples of
Dimensions
installation
IV
180
Open
80
Open
φ
12.7
(
1
/
2"
)(
Flare
)
Content
C
Pipe
/
cable draw-out hole
D
E
Anchor bolt hole
Drain discharge hole
Symbol
B
A
Service valve connection
(
gas side
)
M10 × 4places
φ
20 × 5places
Service valve connection
(
liquid side
)
φ
6.35
(
1
/
4"
)(
Flare
)
Notes
(
1
)
It must not be surrounded by walls on the four sides.
(
2
)
The unit must be fixed with anchor bolts. An anchor bolt must not
protrude more the 15mm.
(
3
)
Where the unit is subject to strong winds, lay it in such
a direction that the blower outlet faces perpendicularly
to the dominant wind direction.
(
4
)
Leave 1m or more space above the unit.
(
5
)
A wall in front of the blower outlet must not exceed the units height.
(
6
)
The model name label is attached on the right side of the unit.
A
C
Terminal block
B
93
42.5
640
800
89
510
201
327.3
83.5
290
43.5
327.3
50.6
12
24.3
312.5
14.8
71.2
17.9
40°
40°
33.5
148.4
12.4
351.6
38.6
90.6
520.6
161
35.6
D
E
Unit:mm
Summary of Contents for SRK60ZJX-S
Page 85: ... 84 10 SR T 091 4 Ceiling cassette 4way compact type FDTC ...
Page 89: ... 88 10 SR T 091 a PJA012D783 ...
Page 189: ... 188 10 SR T 091 09 SRK DB 087D Service data record form 182 ...
Page 267: ... 266 10 SR T 091 12 5 Super link E board SC ADNA E F SL2NA E and SL3N AE BE to control ...
Page 268: ... 267 10 SR T 091 ...