-
264
-
'10 • SR-T-091
Names of recommended signal wires
Terminal
block for
Super link
E board
Terminal
block for
iterface
Y
X
Y
X
DIP switch
(SW2-2)
●
XR
1~4
are for the DC 12V relay
●
XR
5
is a DC 12/24V or AC 220~240V relay
●
CNT connector (local) maker, model
Connector
Molex
5264-06
Molex
5263T
Terminals
DIP switch
(SW2-3)
DIP switch
(SW2-1)
CNT
connector
1
2
3
4
5
6
XR
1
XR
2
XR
3
XR
4
XR
5
XR
5
XR
1
XR
2
XR
3
XR
4
Output 1
Common
Output 2
Output 3
Output 4
[
Input
0.3 mm
2
(Keep the distance between the relay and the
CNT terminal within 2 m.)
Operation output
Output 1
Output 2
Output 3
Output 4
Input/
Output
Content
Function
Relay
ON/OFF
Output signal
Heating output
Compressor operation output
Malfunction output
XR
1
During air-conditioner operation
XR
2
During heating operation
XR
3
During compressor running
XR
4
ON
ON
ON
ON
During anomalous stop
Input
Input/
Output
Operation by
Remote Controller
Air-
Conditioner
Function
Setting
Setting
Content
SW2-1
SW2-3
Input signal
Level/Pulse XR
5
OFF
→
ON
ON
→
OFF
OFF
→
ON
ON
→
OFF
OFF
→
ON
OFF
→
ON
ON
→
OFF
ON
OFF
OFF
OFF
OFF
→
ON
ON
→
OFF
ON
OFF
Allowed
Not allowed
Allowed
Not allowed
External input
Operation permission
Operation prohibition
External input
Operation permission
Operation prohibition
External
control
input
ON* Level input
OFF
ON*
OFF
ON*
OFF
Pulse input
Level
Level
Pulse
Shielded wire
Vinyl cabtyre round cord
Vinyl cabtyre round cable
Vinyl insulated wirevinyl sheathed cable for control
It is available to operate the air conditioning unit and to monitor the operation status with the external control unit (remote display)
by sending the input/output signal through CNT connector on the indoor control PCB.
①
Connect a external remote control unit (locally procured)
to CNT terminal.
②
In case of the pulse input, switch OFF the DIP switch
SW2-1 on the interface PCB.
③
When setting operation permission/prohibition mode,
switch OFF the DIP switch SW2-3 on the interface PCB.
Connection of super link E board
Functions of CNT connector
①
Switch ON the DIP switch SW2-2 (Factory setting: ON) on the interface PCB.
②
Wiring connection between the interface and the super link E board.
③
Clamp the connection cables with cable clamps.
Regarding the connection of super link E board, refer to the instruction manual of super link E board.
For electrical work, power supply for all of units in the super link system
must be turned OFF.
AC 220~240V
Caution:Wireless remote controller attached to the indoor unit can be used in parallel, after
connecting the wired remote controller. However, some of functions other than
the basic functions such as RUN/STOP, Temperature Setting, etc. may not work
properly and may have a mismatch between the display and the actual behavior.
No.
1
2
3
4
Within 200 m 0.5 mm
2
s
2 cores
Within 300 m 0.75 mm
2
s
2 cores
Within 400 m 1.25 mm
2
s
2 cores
Within 600 m 2.0 mm
2
s
2 cores
Power supply
DC 12/24V or
AC 220~240V
* Factory setting
Interface side
Super link E board
Summary of Contents for SRK60ZJX-S
Page 85: ... 84 10 SR T 091 4 Ceiling cassette 4way compact type FDTC ...
Page 89: ... 88 10 SR T 091 a PJA012D783 ...
Page 189: ... 188 10 SR T 091 09 SRK DB 087D Service data record form 182 ...
Page 267: ... 266 10 SR T 091 12 5 Super link E board SC ADNA E F SL2NA E and SL3N AE BE to control ...
Page 268: ... 267 10 SR T 091 ...