10
ENGLISH
8.3. Connecting direction for refrigerant
piping
Two connecting directions are available for refrigerant piping of the out-
door unit, bottom piping and front piping, as shown below:
C
A
B
A
Knock-out hole
B
Bottom piping
C
Front piping
Note:
In the case of bottom piping, build a 100 mm or higher foundation
so that piping will go through the bottom of the unit.
8.4. Noise level
(50/60Hz)
PUHY-P400
PUHY-P500
60/61 dB(A)
1m
1m
A
B
A
Front
B
Measuring point
Measuring location: a room free from echoes and reverberations
Summary of Contents for CITY MULTI PUHY-P-YMF-B
Page 37: ...37 ENGLISH ...
Page 73: ...73 DEUTSCH ...
Page 109: ...109 FRANÇAIS ...
Page 145: ...145 NEDERLANDS ...
Page 181: ...181 ITALIANO ...
Page 182: ......
Page 183: ......