RULES FOR THE FIELD INSTALLATION OF
PUMPED-TYPE LIQUID SUPPLY SYSTEMS
APPLICABILITY: All Washer-Extractor Models
Ê
GENERAL
Pellerin Milnor Corporation does not guarantee machines against damage from corrosion caused
by improper installation and/or operation of pumped-type liquid supply systems. The following
precautions must be observed when pumps are used:
1.
Always install the pumping unit lower than the dis-
charge end of the chemical delivery tube as shown
at right. This will prevent any excess chemical con-
centrate from dribbling out of the tube and onto
unprotected machine surfaces when the machine is
idle.
Merely putting a "drip loop" in the delivery tube
won’t help much. (It might reduce the dribble a
little, but not enough to prevent damage.) The real
solution is to install the pumps below the dis-
charge end of the delivery tubes so excess chemical
won’t dribble out of the tube long after the pumps
stop.
2.
If the machine is also equipped with a flushing supply injector:
a.
Always wire the new system so the appropri-
ate flushing valve also operates whenever
chemical is being injected. This will dilute
the concentrated chemical with obvious ad-
vantages. If possible, the water flushing valve
should remain on for a minimum of 30 sec-
onds after the longest injection time for that
chemical.
b.
Always inject the chemical into a plastic cup
(and direct the flushing water into the same
cup). This way, any chemical that dribbles out
Discharge end
of delivery tube
Pum p (below
discharge end
of delivery tube)
Flush valve ON
when pum p is
operating
Supply
tube feeds
into cup
Summary of Contents for 72044 WP2
Page 6: ......
Page 8: ......
Page 23: ...Section 1 Service and Maintenance ...
Page 40: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 64: ......
Page 65: ...Section 2 Shell and Door Assemblies ...
Page 70: ......
Page 72: ......
Page 76: ......
Page 79: ...Section 3 Drive Assemblies ...
Page 90: ......
Page 93: ......
Page 99: ......
Page 100: ......
Page 103: ......
Page 110: ......
Page 111: ...Section 4 Bearing Assemblies ...
Page 122: ......
Page 124: ......
Page 125: ...Section 5 Frame Pivots and Suspension ...
Page 126: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 143: ......
Page 146: ......
Page 147: ...Section 6 Control and Sensing Devices ...
Page 150: ......
Page 153: ...Section 7 Chemical Supply Devices ...
Page 156: ......
Page 158: ......
Page 159: ...Section 8 Water and Steam Piping and Assemblies ...
Page 160: ......
Page 169: ......
Page 173: ......
Page 178: ......
Page 179: ...Section 9 Pneumatic Piping and Assemblies ...
Page 183: ......
Page 184: ......
Page 185: ......
Page 188: ......
Page 195: ......