- 73 -
Calibrating the Flowrate
When
The flowrate should be calibrated when a:
•
new consumble is installed such as a:
−
POD Pak, or
−
Q-Gard Pack, and
−
Quantum Cartridge
•
sensor or major component is changed.
•
feedwater parameter has changed such as the:
−
pressure
setting of pressure regulator,
larger or smaller Reservoir, or
Inlet Strainer cleaned
−
temperature changed (> 3°C).
Procedure
Follow the procedure shown in the Installation Chapter.
Summary of Contents for milli-q
Page 1: ...User Manual Milli Q Reference System...
Page 36: ...36 Software Map M a p...