![Millipore milli-q User Manual Download Page 59](http://html1.mh-extra.com/html/millipore/milli-q/milli-q_user-manual_1796898059.webp)
- 59 -
Maintenance Schedule
Consumables
Item Maintenance
needed When
Q-Gard Pack
Replacement
Prompted to by an LCD
message.
Quantum Cartridge
Replacement
Prompted to by an LCD
message.
POD Pak
Replacement
Prompted to by an LCD
message or as necessary.
Lamp
Item Maintenance
needed When
UV 185 nm Lamp
Replacement
Prompted to by an
LCD message.
NOTE:
It is recommended to have a Millipore Field Service Representative change
the UV Lamp in the system.
The replacement of this lamp involves removing the cover of the system. The
instructions for replacing these lamps are not included in this User Manual.
The instructions are included with the replacement lamp.
Cleaning/
Sanitisation
Item Maintenance
needed
When
Inlet Strainer
Cleaning
Prompted to by an LCD
message or as necessary.
System
Sanitisation
Contact Millipore for more
details.
Calibrating the
flowrate
Item Maintenance
needed
When
Flowmeter
Recalibration
New Consumable, Sensor or
change to Feedwater.
See ‘Calibrating the Flowrate’
for more information.
Summary of Contents for milli-q
Page 1: ...User Manual Milli Q Reference System...
Page 36: ...36 Software Map M a p...