15
Set-Up And Assembly
Assemble Bag Boom
1. Lift the bag boom up into position above the pivot tube. Place the brass spacer onto the pivot
end of the bag boom and lower the pivot shaft into the pivot tube on the bagger. Grease both
grease fittings after assembly and rotate bag boom back and forth to distribute the grease
evenly. Do not over grease. Pivot tube is open on the bottom.
2. Use the winch to lower the cable down slightly, hook the cable end onto the bag cradle. Remove
the slack from the cable.
Brass Spacer
Grease
Fittings
Bag Boom
Assemble Tunnel Extension
NOTE:
Two people are required for tunnel extension assembly.
1. Lift the tunnel extension into position. Slide the tunnel extension inside the bagger tunnel and
line up the holes in the tunnel with the slotted holes in the tunnel extension.
2. Starting at the top center of the tunnel, insert the bolts from the outside and assemb
le a flat
washer and locknut on the inside. Inserting the bolts from the outside will prevent bag damage
by providing a smooth surface for the bag to slide over. Assemble the bolts from the top center
around to the bottom edges of the tunnel. Do not fully tighten any bolts until all the bolts are as-
sembled.
3. After all the bolts are assembled, securely tighten the bolts using the same sequence as when
assembling the bolts.
Tunnel Extension
Top Center Bolt