Application technology
39
... middle position:
Move the roller brackets on both sides to the middle position and
secure them firmly.
Position the stainless steel plate over the openings in the water
supply pipe so that one of the outer openings are covered. Secure
the stainless steel plate at the top or bottom with 2 screws. Place
the water connector in the middle opening of the stainless steel
plate so that the outer opening is covered. Secure the water con-
nector with 4 screws.
... lower position:
Move the roller brackets on both sides to the top position and se-
cure them firmly.
Position the stainless steel plate over the openings in the water
supply pipe so that the lower opening is covered. Secure the stain-
less steel plate at the bottom with 2 screws. Place the water con-
nector in the upper opening of the stainless steel plate so that the
middle opening is covered. Secure the water connector with 4
screws.
Then check:
Put the upper basket back on the rails and push it in carefully to
check that the water connection is positioned correctly.