Commissioning
28
Commissioning
completed
Commissioning is completed when the following message is dis-
played.
Set up successful
Confirm the message with
OK
.
The machine is now ready for use.
Normal plus
Temperature
Duration
h
1:30
75 °C
The settings made during the commissioning process are only
adopted after a complete program has been run.
Select any program, e.g.:
Drain
.
Press the
Start/Stop
button to start the program.
After commissioning, every program starts with reactivation of the
water softener.
Fault 420
If the program is canceled using
Fault 420
, all the plumbing connec-
tions are deactivated.
Confirm the error message with
OK
.
Use the
button to switch the machine off.
Wait approximately 10 seconds before switching the machine on
again with the
button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing connec-
tion; e.g. for cold water.