Commissioning
25
Installation and connection
Before commissioning, the machine must be securely installed, and
the water inlet and drain hoses and the power cord correctly con-
nected. See “Installation,” “Water connection,” and “Electrical con-
nection” and the installation plan supplied.
Procedure
During commissioning, a set procedure is followed which must not be
interrupted, e.g. by opening the door. The display will automatically
guide you through the process.
All settings, except for selecting the water connections, can be retro-
spectively altered via the
Settings
and
Additional settings
menus.
The settings made during the commissioning process are only
adopted after a complete program has been run.
If the program is interrupted or if no program is started or the ma-
chine is switched off, the commissioning process must be carried
out again.
Turning on the
machine
Press the
button until the LED on the keypad lights up.
Selecting the
language
The commissioning process starts with selecting the language.
Language
english (GB)
english (USA)
(
Use the
and
arrow buttons to select the language you want
and hit
OK
to save.
Selecting the
temperature unit
The menu for selecting the temperature unit will then appear.
Temperature unit
°C
°F
Use the
and
arrow buttons to select the temperature unit you
want and hit
OK
to save.