Service manual
8.5
Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the
3-way valve.
Connect the charge hose with the push pin to the gas service port.
4. Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service
port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
16
Summary of Contents for MSV1-09HRDN1
Page 1: ...Cover MSV1 09HRDN1 MSV1 12HRDN1...
Page 4: ......
Page 11: ...Service manual 5 Refrigerant cycle diagram 7...
Page 14: ...Service manual 7 1 2 Indoor main PCB 10...
Page 15: ...Service manual 7 1 3 Outdoor main PCB 11...
Page 16: ...Service manual 7 1 4 Outdoor power PCB 12...
Page 17: ...Service manual 7 2 Wiring diagram 7 2 1 MSV1 09HRDN1 MSV1 12HRDN1 13...