Service manual
8.7
Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge
indicates 0.05 to 0.1 Mpa.
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is
higher than 0.1Mpa, discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the
case, it will not be necessary to apply a evacuation.
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil sill be
discharged.
18
Summary of Contents for MSV1-09HRDN1
Page 1: ...Cover MSV1 09HRDN1 MSV1 12HRDN1...
Page 4: ......
Page 11: ...Service manual 5 Refrigerant cycle diagram 7...
Page 14: ...Service manual 7 1 2 Indoor main PCB 10...
Page 15: ...Service manual 7 1 3 Outdoor main PCB 11...
Page 16: ...Service manual 7 1 4 Outdoor power PCB 12...
Page 17: ...Service manual 7 2 Wiring diagram 7 2 1 MSV1 09HRDN1 MSV1 12HRDN1 13...