7 – Manufacturing Test
58
IGLOO2 FPGA Evaluation Kit User Guide
Test Procedure for SPI FLASH
1. Click
SPI FLASH TEST
to start SPI FLASH test.
Figure 39
shows the status as PASS once the test is
completed successfully.
Figure 39.
SPI FLASH Test
2. Close the
MTD TESTER
window once the test is completed.
3. Click
Clear Status
to clear the status.
Switches and LED Tests
Use the following switches to test the corresponding LED:
•
Press SW6, H5 LED must glow.
•
Press SW7, H6 LED must glow.
•
Press SW4, J6 LED must glow.
•
Press SW3, H7 LED must glow.
Debugging the Board
If the board is not programmed successfully, check if all the required power supplies, clocks, and reset signals are
within the accepted range or not.
Power Supply Validation
1. Check for all default jumper settings as per
Table 4
.
2. After power ON, power supplies with respect to the ground must be measured and the range must be
as listed in
Table 15
:
Table 15.
Power Supply Range
Power Rail
Probing point
Accepted Voltage Range. (in Volt)
1P2V
C95 Pin 2
1.15<VDD_REG<1.25
5P0V
C16 pin 2
4.75<5P0V<5.25
3P3V
C76 pin 2
3.15<3P3V<3.46