Chapter 3: Operation
3-LV-1-7 9/7/11
LV1 User Manual
3-4
Foundation/Benchtop
The foundation or benchtop of the proposed operating site MUST be able to support the gross
weight of the Microfluidizer equipment, including oil.
Clearances
A minimum clearance of 10 inches (25.4 cm) around all sides of the Microfluidizer equipment is
required.
Moving the Equipment
A forklift or a hand truck should be used when lifting the Microfluidizer equipment from the
shipping crate to its new location. Make certain the lifting device is rated for the maximum weight
of the equipment. See below for forklift location.
Lift with forklift here
Dimensions
Width
Height
Depth
Weight (with oil)
51.0 cm
(20 in)
60.2 cm
(23.7 in.)
(65 cm)
(25.8 in)
(109 kg)
(240 lb.)
Utility Requirements
Electrical (General)
Electrical requirements vary by location.
Voltage
Current
Phase
Frequency
110/208 to 230VAC
10/5
1
60 Hz
208 to 230VAC
5 Amps
1
50 Hz