Page 23
Operation
surfaceCONTROL 3D SC2500 / SC2510
6.
Operation
6.1
Turning On
Switch on the power supply (24 VDC) on the controller.
Press the
Power
button on the controller.
TX1
Power
2
1
RX1
TX2
RX2
The
Power
LED on the controller is illuminated red if the power supply is sufficient, and green after pressing the Power
button.
It starts when the supply voltage is applied.
i
The surfaceCONTROL 3D 25x0 sensor requires a warm-up time of typically 60 minutes for precise measurements.
6.2
Operating Programs
Various programs are provided for operation of the sensor.
-
3DInspect solves industrial 3D measurement tasks.
-
You can use surfaceCONTROL DefMap3D for the analysis of individual surfaces with surfaceCONTROL 3D 25x0.
6.3
Installation
6.3.1
Requirements
The following minimum system specifications are necessary for the use of the operating programs:
-
Windows 10 (64 bit)
-
≥ 2 GHz processor (64 Bit) or higher
-
4 GB RAM
-
Screen resolution: 1280 x 1024
-
Graphics card/GPU with OpenGL 3.1 or higher
The following procedure is necessary in order to install the software:
1. Install the hardware of the Ethernet interface(s) if not present.
2. Install the software.
3. With DefMap3D: use the USB dongle required for this.
4. Connect the controller of the surfaceCONTROL 3D 25x0 measuring system to the PC via Ethernet.
i
If your network card supports the VLAN option, this option must be disabled.
Summary of Contents for surfaceCONTROL SC2500