Page 37
Operation
optoNCDT 1900 / EtherCAT
6.
Operation
6.1
Getting Ready for Operation
Mount the optoNCDT 1900-IE according to the assembly instructions, see Chap.
.
Connect the sensor to the downstream display or monitoring units and to the voltage supply, if no PoE is used.
The laser diode in the sensor is only activated
- due to software command or
- if the black and violet wires of the PC1900-IE-x/OE-RJ45 are connected, see Chap.
.
Once the power supply has been switched on, the sensor runs through an initialization sequence. Already within the first second a
connection to the sensor can be established and the measurement can be started.
During the first three seconds, an internal function check in the sensor is indicated by the Status LED, which lights up in the colors
red, yellow and green one after another.
Initialization takes a maximum of 3 seconds. Within this period, only the reset or the bootloader command is executed via the
Select
button.
The sensor typically requires a warm-up time of 20 min for reproducible measurements.
If the
State
LED is off, the laser light source has been switched off.
If all LEDs are off, no power is being supplied.
Summary of Contents for ILD1900-10
Page 8: ...optoNCDT 1900 EtherCAT ...
Page 110: ...Page 110 Appendix EtherCAT Documentation optoNCDT 1900 EtherCAT ...
Page 111: ......