Pxxx/EN SS/G11
Page 4/8
Safety Section
3.
SYMBOLS AND EXTERNAL LABELS ON THE EQUIPMENT
For safety reasons the following symbols and external labels, which may be used on the
equipment or referred to in the equipment documentation, should be understood before the
equipment is installed or commissioned.
3.1 Symbols
Caution: refer to equipment documentation
Caution: risk of electric shock
Protective Conductor (*Earth) terminal
Functional/Protective Conductor (*Earth)
terminal.
Note: This symbol may also be used for a
Protective Conductor (Earth) Terminal if that
terminal is part of a terminal block or sub-
assembly e.g. power supply.
*NOTE:
THE TERM EARTH USED THROUGHOUT THIS GUIDE IS THE
DIRECT EQUIVALENT OF THE NORTH AMERICAN TERM
GROUND.
3.2 Labels
See Safety Guide (SFTY/4L M/G11) for equipment labelling information.
4.
INSTALLING, COMMISSIONING AND SERVICING
Equipment connections
Personnel undertaking installation, commissioning or servicing work for this
equipment should be aware of the correct working procedures to ensure safety.
The equipment documentation should be consulted before installing,
commissioning, or servicing the equipment.
Terminals exposed during installation, commissioning and maintenance may
present a hazardous voltage unless the equipment is electrically isolated.
The clamping screws of all terminal block connectors, for field wiring, using M4
screws shall be tightened to a nominal torque of 1.3 Nm.
Equipment intended for rack or panel mounting is for use on a flat surface of a
Type 1 enclosure, as defined by Underwriters Laboratories (UL).
Any disassembly of the equipment may expose parts at hazardous voltage, also
electronic parts may be damaged if suitable electrostatic voltage discharge (ESD)
precautions are not taken.
If there is unlocked access to the rear of the equipment, care should be taken by
all personnel to avoid electric shock or energy hazards.
Voltage and current connections shall be made using insulated crimp terminations
to ensure that terminal block insulation requirements are maintained for safety.
Watchdog (self-monitoring) contacts are provided in numerical relays to indicate
the health of the device. Schneider Electric strongly recommends that these
contacts are hardwired into the substation's automation system, for alarm
purposes.
Summary of Contents for P721
Page 2: ......
Page 4: ...P72x EN T C21 Technical Guide Contents Page 2 2 MiCOM P721 P723 BLANK PAGE...
Page 5: ...Pxxx EN SS G11 SAFETY SECTION...
Page 6: ......
Page 8: ...Pxxx EN SS G11 Page 2 8 Safety Section BLANK PAGE...
Page 15: ...Introduction P72x EN IT C21 MiCOM P721 P723 INTRODUCTION...
Page 16: ......
Page 18: ...P72x EN IT C21 Introduction Page 2 10 MiCOM P721 P723 BLANK PAGE...
Page 26: ...P72x EN IT C21 Introduction Page 10 10 MiCOM P721 P723 BLANK PAGE...
Page 28: ......
Page 30: ...P72x EN IN C21 Handling Installation and Case Dimensions Page 2 10 MiCOM P721 P723 BLANK PAGE...
Page 39: ...User Guide P72x EN FT C21 MiCOM P721 P723 USER GUIDE...
Page 40: ......
Page 78: ...P72x EN FT C21 User Guide Page 38 38 MiCOM P721 P723 BLANK PAGE...
Page 79: ...Menu Content Tables P72x EN HI C21 MiCOM P721 P723 MENU CONTENT TABLES...
Page 80: ...P72x EN HI C21 Menu Content Tables MiCOM P721 P723 BLANK PAGE...
Page 82: ...P72x EN HI C21 Menu Content Tables Page 2 8 MiCOM P721 P723 BLANK PAGE...
Page 89: ...Technical Data P72x EN TD A11 MiCOM P721 P723 TECHNICAL DATA...
Page 90: ......
Page 108: ...P72x EN TD A11 Technical Data Page 18 18 MiCOM P721 P723 BLANK PAGE...
Page 109: ...Getting Started P72x EN GS C21 MiCOM P721 P723 GETTING STARTED...
Page 110: ......
Page 112: ...P72x EN GS C21 Getting Started Page 2 24 MiCOM P721 P723 BLANK PAGE...
Page 135: ...Application Guide P12x EN AP C21 MiCOM P721 P723 APPLICATION GUIDE...
Page 136: ......
Page 189: ...Communication database P72x EN CT A11 MiCOM P721 P723 COMMUNICATION DATABASE...
Page 190: ...P72x EN CT A11 Communication database MiCOM P721 P723 BLANK PAGE...
Page 192: ...P72x EN CT A11 Communication database Page 2 78 MiCOM P721 P723 BLANK PAGE...
Page 238: ...P72x EN CT A11 Communication database Page 48 78 MiCOM P721 P723 BLANK PAGE...
Page 240: ...P72x EN CT A11 Communication database Page 50 78 MiCOM P721 P723 BLANK PAGE...
Page 252: ...P72x EN CT A11 Communication database Page 62 78 MiCOM P721 P723 BLANK PAGE...
Page 254: ...P72x EN CT A11 Communication database Page 64 78 MiCOM P721 P723 BLANK PAGE...
Page 256: ...P72x EN CT A11 Communication database Page 66 78 MiCOM P721 P723 BLANK PAGE...
Page 268: ...P72x EN CT A11 Communication database Page 78 78 MiCOM P721 P723 BLANK PAGE...
Page 270: ......
Page 298: ...P72x EN CM C21 Commissioning and Maintenance Page 28 28 MiCOM P721 P723 BLANK PAGE...
Page 299: ...Connection Diagrams P72x EN CO A11 MiCOM P721 P723 CONNECTION DIAGRAMS...
Page 300: ......
Page 304: ......
Page 306: ...P72x EN RS A11 Commissioning Test Record Sheets Page 2 22 MiCOM P721 P723 BLANK PAGE...
Page 326: ...P72x EN RS A11 Commissioning Test Record Sheets Page 22 22 MiCOM P721 P723 BLANK PAGE...
Page 328: ......
Page 333: ......