2
HLP-SERIES Hot Water Pressure Washer Operator's Manual
table of contents
introduction ................................................................................................................................................3
important safety instructions .........................................................................................................4-9
RISK OF EXPLOSION OR FIRE .....................................................................................................4
RISK OF ASPHYXIATION ...............................................................................................................5
RISK OF ELECTROCUTION OR ELECTRICAL SHOCK ...............................................................6
RISK OF INJECTION OR SEVERE CUTTING INJURY .................................................................7
RISK OF BURNS .............................................................................................................................8
RISK OF BURSTING .......................................................................................................................8
RISK FROM MOVING PARTS ........................................................................................................8
RISK OF BODILY INJURY ..............................................................................................................9
features ..................................................................................................................................................10-11
installation instructions ...............................................................................................................12-16
SET-UP ..........................................................................................................................................2
ELECTRICAL .................................................................................................................................3
WATER SUPPLY ...........................................................................................................................4
HIGH PRESSURE CONNECTION ................................................................................................4
INSPECTING AND VERIFYING CONDITIONS ............................................................................5
PRE-OPERATION CHECKLIST ....................................................................................................6
preparation instructions
...............................................................................................................
17-19
ATTIRE ..........................................................................................................................................7
PRE-START ...................................................................................................................................7
UNLOADER ...................................................................................................................................7
QUICK-CONNECT NOZZLES .......................................................................................................8
NOZZLE CONNECTION ...............................................................................................................8
PRE-START SAFETY INSPECTION .............................................................................................9
operatinG instructions .......................................................................................................................................21-23
FLUSHING THE SYSTEM ............................................................................................................2
COLD WATER OPERATION .........................................................................................................2
LIGHTING PILOT VALVE ..............................................................................................................2
HOT WATER OPERATION ............................................................................................................22
STEAM OPERATION ....................................................................................................................22
CLEANING WITH DETERGENTS ................................................................................................23
SHUTDOWN .................................................................................................................................23
maintenance instructions ..............................................................................................................24-25
PREVENTIVE MAINTENANCE ....................................................................................................24
WINTERIZING ...............................................................................................................................25
maintenance cHarts ...............................................................................................................................26
troublesHootinG ................................................................................................................................27-28
statement of Warranty .........................................................................................................................29
national codes:
ansi Z223.1 (nfpa no. 54) national fuel Gas code.
nfpa no. 70 (nec) national electrical code.
csa b149.1 Gas installation code.
csa c22.1 canadian electrical code part 1.