WESROC© RMS Satellite Repeater – User Manual
Metrotel Corporation of Minnesota, Inc.
Revision A. May 7, 2008
Page 20
To change the day of the week scheduled reporting, move the cursor to the
“Weekly Rpt” line and press the right button. The following screen will be
displayed:
Day of the Week Scheduled Reporting Configuration Screen
To change the scheduled reporting status for a day of the week, move the cursor
up and down to reach the day of the week to be changed. Then press the right
button. This toggles (Yes to No to Yes to No, etc…) the reporting status for the
selected day. The change request is not actually sent to the satellite repeater
until all day of the week changes are made and the PDU is returned to the
transmitter configuration screen. This is performed by pressing the left button
from the day of the week scheduled reporting configuration screen. This sends a
request to the Satellite Repeater to set the weekly scheduled reporting to the
selected days for the current transmitter. The status itself is not changed until the
Satellite Repeater receives the change request, makes the change, then sends
the updated parameters back to the PDU. This ensures that the status shown in
the transmitter configuration screen is the actual current configuration of the
Satellite Repeater.
Day of the Month Scheduled Reporting
Monthly Rpt: None
Monthly reporting configures the Satellite Repeater to schedule reports on the
days of the month selected for the current transmitter. For instance it may be
preferred to send a report only on the first of the month, instead of weekly. In this
case, all of the day of the week reporting should be turned off. Then the first day
of the month should be set in monthly reporting.