MI 3155
Eurotest
XD
Appendix F
– Programming of AutoSequences
on Metrel ES Manager
239
Saves / Saves as Custom Inspection Data file opened on active tab.
Menu for browsing to the folder location and editing of file name is opened.
Browse to the location, confirm overwriting, if file already exists or edit file name to
save it as a new Custom Inspection Data file.
Add New Custom Inspection.
New inspection with default name
Custom Inspection
and default scope
Visual
appear on the editor workspace. It contains one Item task with default name
Custom Inspection
and default Type
Pass_Fail_Checked_Empty
. Default Name
and Type can be edited
– changed.
Remove selected custom inspection.
To select inspection, click to the inspection Name field. To remove it, select icon
from editor main menu. Before removal, user is asked to confirm deletion.
Edit Name and Scope of Inspection
Inspection Name edit:
Click to the Inspection Name field to start editing it.
Drag cursor, with left mouse button pressed, to select letters and words.
Position cursor and double-click to select word of the name. Actions
could be performed with keyboard also.
Press right mouse button to activate Edit menu and select appropriate
action as presented on the left figure. Menu is case sensitive; options
currently not available are greyed out.
Inspection Scope edit:
Click to Inspection Scope field to open selection menu presented on left
figure. Options:
Visual
is intended for observation of test object
Functional
allows functional test of observed object
Edit Item task structure of Inspection
Item tasks of the selected Inspection are listed in Name column on
the right side of Editor workspace.
Each Item task can have Child Item tasks, Child Item can have its
own Child Item tasks and so on.
Arbitrary tree structure of Item tasks and subtasks can be built as
presented on left figure.
ADD New Item task procedure:
Position cursor above Item task Name and apply right mouse click
to select Item task and open menu with options:
Add New
: new Item task is added on the top tree level
Add New Child
: new child Item task is added under selected Item
Remove selected
: delete selected Item task with all subtasks