MI 3152(H)
Eurotest
XC (2,5 kV)
Auto tests
136
Measurement procedure
Enter the
AUTO IT
function.
Set test parameters / limits.
Measure the impedance Zref at origin (optional), see chapter
7.13 Voltage Drop
.
Connect test cable to the instrument.
Connect test leads to the object under test, see
Figure 8.13
.
Start the Auto test.
Save results (optional).
Figure 8.14: Examples of AUTO IT measurement results
Measurement results / sub-results
Uln
Voltage between phases L1 and L2
dU
Voltage drop
Isc1
First fault leakage current at single fault between L1/PE
Isc2
First fault leakage current at single fault between L2/PE
R1
Threshold insulation resistance between L1-PE
R2
Threshold insulation resistance between L2-PE
I1
Calculated first fault leakage current for R1
I2
Calculated first fault leakage current for R2
Z (LN)
Line impedance
Zref
Reference Line impedance
Ipsc (LN)
Prospective short-circuit current