BAM 1020-9800 Manual Rev W.docx
Page 8
2
SITE SELECTION AND INSTALLATION
2.1 Unpacking, Inspection, and Evaluation Testing
If any damage to the shipment is noticed before unpacking,
a claim must be filed with the
commercial carrier immediately
. Notify Met One Instruments after notification of the
commercial carrier.
Unpack the BAM 1020 and accessories and compare them to the packing list to make sure
you have all of the required items for the type of installation you plan to perform. A separate
quick setup guide with color photos of most of the common accessories will be included with
the this manual. You can use the quick setup guide to fully configure and operate the BAM
1020 on a test bench if desired.
The BAM 1020 is shipped with one or two white foam rings and a white plastic shim inside
the front of the BAM 1020, which prevent the moving parts of the tape control assembly from
being damaged during transit. The rings and shim should be replaced when the BAM 1020 is
being transported in order to avoid damaging the tape control mechanism. Do not ship or
transport the BAM 1020 with filter tape installed. We recommend that you keep the special
shipping box and foam packing material which the BAM 1020 came in as they could be re-
used if you must return the BAM 1020 to the factory for any reason.
2.2 Enclosure Selection and Temperature Control
The BAM 1020 monitor is not weatherproof. It is designed to be mounted in a weatherproof,
level, low vibration, dust free, and temperature-stable environment where the operating
temperature is between 0
o
C and +50
o
C, and where the relative humidity is non-condensing
and does not exceed 90%. There are two standard configurations described below for
providing a weatherproof location in which to install the BAM 1020. Please contact Met One
Instruments for advice if you plan to have a non-standard mounting or enclosure
configuration.
1.
A walk-in shelter or building:
These are usually semi-portable pre-fabricated
shelters or portable trailers with a flat roof, or a room in a permanent building or
structure. The BAM 1020 may be placed on a workbench or mounted in an equipment
rack. The inlet tube of the BAM must extend up through a hole in the roof of the
structure with appropriate sealing hardware. AC power must be available. Instructions
for this type of installation are included in this section of this manual.
2.
BX-902/903/906 mini weatherproof enclosures:
these small pre-fabricated
enclosure are just big enough for the BAM and related accessories, and are installed
on the ground or on the roof of a larger building. They are available with a heater (BX-
902), or with a heater and air conditioner (BX-903). A dual-unit air conditioned mini
shelter is also available (BX-906). These enclosures are all specified by Met One to
accept the BAM 1020, and are supplied with a supplemental installation manual.
Shelter Temperature Control Notes:
The air temperature inside a BAM shelter or enclosure
is not required to be regulated to any specific narrow range or set point (such as 25 °C),
subject to the following caveats: