background image

P 5

28

Pre drill 

hole

70mm 

screw

Step 4 

Parts needed - No. 28 QTY 2

 

 

   No. 29 QTY 2

Place the starter boards (

No. 

28)

 and

 

the first two log boards

 

(No. 29

) in the notch as shown 

onto the assembled base frame 

along the longest sides.

Ensure the boards sit square on 

the base using the same 

method used in Step 1.  Meas-

ure corner to corner, making 

sure the measurements are 

equal.

Once the boards are square, lift 

up the log boards 

(No. 29

) and 

fix the starter boards in place 

(

No. 28).

Fix each of the starter boards to 

the frame by screwing through 

the notch into the frame as 

shown in the illustration.

4x70mm Screws 

IMPORTANT: 

Pre-drill before fixing screws.

29

29

28

28

Step 5

Parts needed - No. 29 QTY 10 

 

 

   No. 32 QTY 12

 

 

   No. 33 QTY 12

                                 No. 34 QTY 6

Following the same method

outlined in 

Pre-Assembly

, lay the 

required boards (

No’s. 29, 32, 

33 & 34

) onto the starter boards 

to create your first level.

*Ensure that the boards are

level and flush with each other 

as you lay each one.

33

33

32

29

34

29

32

Rubber Mallet 

may be required 

to fit parts.

IMPORTANT : 

Pre-drill before fixing screws.

7

10

Step 6

Parts Needed - No. 7 QTY 2

 

 

    No. 8 QTY 2

 

 

    No. 9 QTY 2

 

 

    No. 10 QTY 2

Arrange the left, right, top & bottom tall 

window frames (

No’s. 7, 8, 9, & 10

) onto a firm 

and level surface. Secure the top and bottom 

frames to the uprights using 2x80mm screw per 

corner, ensuring the screws do 

NOT

 protrude 

through the front of the door framing.

Using the method outlined above, assemble the 

two window frames.

16x80mm Screws

Pre drill 

hole

80mm 

screw

10

8

9

The internal lip of the window 

frame should be positioned on 

the inside of the building.

8

Please retain product label and instructions for future reference

             

Summary of Contents for 0628RANE0504FGDD2TW1SW-V1

Page 1: ...ater during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimension...

Page 2: ...Y 1 PI 07 0188 Adjustable Hinge QTY 6 PI 07 0209 Tower Bolt QTY 2 PI 07 0114 Master Door QTY 1 Morticed for lock AI 06LOGDGFGMD750X1900 V3 18 19 20 22 22a 22c 23 24 25 26 Secondary Door QTY 1 AI 06LOGDGFGSD750X1900 V3 Door Frame Left Upright 71x70x2065mm QTY 1 AI 0628LOGDUFL V3 Door Frame Right Upright 71x70x2065mm QTY 1 AI 0628LOGDUFR V3 Door Frame Top 84x125x1632mm QTY 1 AI 0628LOGDDTF V3 Door F...

Page 3: ...uture reference Log Board 28x120x4000mm QTY 25 LB28 A 4000 Log Board 28x120x1625mm QTY 24 LB28 B 1625 Log Board 28x120x734mm QTY 36 LB28 B 734 Log Board 28x120x232mm QTY 36 LB28 C 232 34 35 Roof Board 16x121x2114mm QTY 92 MB16 2114 Floor Board 16x121x3752mm QTY 44 MB16 3752 36 Bearer 44x44x2316mm QTY 26 F4444 2316 PT 37 Bearer 44x44x3808mm QTY 4 F4444 3808 PT 38 Purlin 45x120x5004mm QTY 5 F45120 A...

Page 4: ...r end IMPORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws 38 38 Pre drill hole 70mm screw Step 2 Parts needed No 38 QTY 11 Following the same method arrange the remaining bearers No 38 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the bearers in place using 2x70mm screws for each side of the bearer ensuring the f...

Page 5: ...6 Following the same method outlined in Pre Assembly lay the required boards No s 29 32 33 34 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one 33 33 32 29 34 29 32 Rubber Mallet may be required to fit parts IMPORTANT Pre drill before fixing screws 7 10 Step 6 Parts Needed No 7 QTY 2 No 8 QTY 2 No 9 QTY 2 No 10 QTY 2 A...

Page 6: ...ger board if you have not yet assembled the window frames refer to step 6 7 Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window position Nevertheless the process of fitting the window is the same Step 9 Parts Needed No 16 QTY 1 No 17 QTY 1 No 18 QTY 1 No 19 QTY 1 Arrange the left right top bottom ...

Page 7: ...ish the position of the hinges The hinges come in three parts Remove the doors from the framing after fitting Ensure to screw into the framing and not into the channel 42x30mm Screws a b 22b a b Secondary Door Master Door 22 Step 11 To adjust and align your doors 1 Lift up the doors to seperate the two parts of the hinge 2 Turn the rotating barrel No 22a in out to move the postion of the doors eit...

Page 8: ...sing 2x80mm screw per corner ensuring the screws do NOT protrude through the front of the window framing 8x80mm Screws Pre drill hole 80mm screw 5 3 5 3 Step 13 Parts needed No 29 QTY 6 No 31 QTY 12 No 32 QTY 12 No 33 QTY 12 No 34 QTY 6 Following the same method outlined in Pre Assembly lay the next 6 boards No s 29 31 32 33 34 onto the log cabin to create your second level Ensure that the boards ...

Page 9: ...e required to fit parts Step 16 Once you have laid the second level of boards onto the log cabin slide the windows frame without main window between the boards if you have not yet assembled the window frame refer to step 14 Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window position Nevertheless ...

Page 10: ...e drill hole Step 20 Parts needed No 40 QTY 5 Align the Purlin s No 40 into the cut out slots on each gable top ensuring each purlin interlocks the boards Secure the Purlins at each end by screwing through the bars into the boards ensure to pre drill to avoid the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from yo...

Page 11: ...oard is interlocked flush at the bottom meet at the top of the apex The last board on each side will overhang Using a straight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per board Please Note This image is for illustrative purposes and may differ from your choic...

Page 12: ...lling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 48x30mm Screws Step 23 Parts needed No 37 QTY 44 Place the first Floor Board No 37 inside the building flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cu...

Page 13: ... 6x30mm screws Ensure the casement stay is centralised on the window Use this method to fit the casement stays to both the windows 6x30mm Screws 1 13 13 Step 28 Lift each door onto the already existing hooks on the door frame ensuring the hook and bands connect Some adjustment may be required to align properly Step 26 Lift each window onto the already existing hooks on the window frame ensuring th...

Page 14: ...Y 1 No 25 QTY 1 Fit the Mortice lock No 24 into the recess in the master door No 15 and secure using the screws provided Attach the Key plate No 25 to the secondary door No 14 with 4x30mm screws Fit the door handles No 23 and connect with the metalbar to the mortice lock using 8x30mm screws Ensure the lock mechanism closes correctly If not remove the lock and turn the catch around by pulling the s...

Page 15: ...he storm braces No 44 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured at the highest point possible on each side The storm braces will need to be altered during the buildings life as the moisture content within the log boards ch...

Page 16: ...ard No 21 to the Door frame fixing in place onto the framing above the Door using 3x70mm screws 12x70mm Screws 70mm screw Pre drill hole 11 11 11 11 21 Step 34 Parts needed No 41 QTY 4 No 42 QTY 4 Align the shorter Fascia s No 41 with the sides of the roof and fix using 4x40mm screws per fascia Do the same with the longer Fascia s No 42 to the front and back of the roof Ensure to screw through the...

Reviews: