P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
IMPORTANT:
Pre-drill before fixing screws.
39
39
38
38
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 38 QTY 2
No. 39 QTY 2
Lay the bearers (
No’s 38 & 39
) onto a
firm and level surface (
free from
areas where standing water can
collect
) as shown in the illustration.
Fix the bearers together at each
corner using 8x70mm screws,
ensuring the frame is flush.
Once fully assembled, ensure the
bearers are square by measuring from
corner to corner as illustrated, making
sure the measurements are equal.
If the bearers are not aligned equally,
unscrew, adjust and re-align accord-
ingly.
8x70mm Screws
Example picture
2 screws per bearer per end.
=
=
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
38
38
Pre drill
hole
70mm
screw
Step 2
Parts needed- No. 38 QTY 11
Following the same method
arrange the remaining bearers (
No.
38
) inside the assembled frame.
*Ensure there is an equal
amount of space between each
frame.
Secure each of the bearers in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
44x70mm Screws
38
38
38
38
38
38
38
38
38
38
38
Pre drill
hole
70mm
screw
Step 3
Parts needed- No. 38 QTY 13
No. 39 QTY 2
Repeat Steps 1 & 2 to create the
second base section.
*Ensure there is an equal
amount of space between each
frame.
Once built secure both base
sections together using 70mm
screws as shown in the
illustration.
64x70mm Screws
Please retain product label and instructions for future reference